ProTech | Supervisor Quality Control & Document Assembly Portal

Supervisor Quality Control & Document Assembly Portal

Business Value: Eliminates ~2.5 hours of manual dossier assembly per asset and structurally blocks unsafe closeouts — no work order releases until every subcomponent passes engineering bounds and reassembly verification. Prevents catastrophic plant startup failures and guarantees audit-ready traceability before the SharePoint sync.

Phase 1A · Steam & Control Valves

Signed in: M. Evans, QC Supervisor

01. Inspection Metadata

Account:

Facility Site:

Master Tote:

Work Order:

Stem Runout (in, tol ≤ 0.0020)

Seating Face Contact (%, min 85)

PMI Metallurgy Tag

    02. Dossier Preview & Assembly

    W Microsoft Word · Traceability Dossier

    Structured Dataverse columns + SharePoint JPEG directory compile into a formatted Word/PDF dossier.

    STEAM-CV-DOSSIER-v1.docx

    Clear all validation gates to enable assembly.

    // Outgoing Dataverse / Power Automate payload
    
            

    Final Release Gatekeeper

    ProTech Energy Services · Phase 1A Traceability & Document Automation · Zero Trust / Least Privilege · Prototype